Can we change the domain controller to be backed up. As the existing Domain controller is going to be decommissioned. If so what is the impact of changing domain controller.
Can we change the domain controller to be backed up. As the existing Domain controller is going to be decommissioned. If so what is the impact of changing domain controller.
In general, I see the following points of change:
1. Backup Collection (scope): add New DC02 and remove old DC01. Both: (collectionA) DR/Local DC storage, and (collectionB) OnlineRestore (RMAD console storage).
2. RMADFE AD Forest DR Project: Update the project with new DC02, if there is dependency on old DC01 (if applied)
3. New DC02 will get RMAD agents deployed. And must have enough local drive (C:\ or D:\) storage for Local DC .BKF storage.
In general, I see the following points of change:
1. Backup Collection (scope): add New DC02 and remove old DC01. Both: (collectionA) DR/Local DC storage, and (collectionB) OnlineRestore (RMAD console storage).
2. RMADFE AD Forest DR Project: Update the project with new DC02, if there is dependency on old DC01 (if applied)
3. New DC02 will get RMAD agents deployed. And must have enough local drive (C:\ or D:\) storage for Local DC .BKF storage.