We have a core with some machines that are being replicated.
The machines and the repository will go to a new server.
I've been looking around and found a few guides on moving the repository.
What I have in mind is installing a 2012 server that has more hardware resources that the one I currently have, but using the same repository.
I know I'll have downtime, I'm ok with whatever time it takes to move everything.
Just looking for suggestions on the recommended steps.
Thank you very much for your time.
Hi Eramos:
You may want to check KB#227314 (How to replace a RapidRecovery or AppAssure Core with minimal downtime). It gives you a step by step process and addresses some "gotchas" that you may encounter during moving your backup/replication from one core to another.
The case discussed in the KB takes into consideration an environment consisting from a source core performing backups which is replicating to a Target core. The Source core is the one to be replaced while keeping replication current.
Hope that this helps.