Hi Eliza,
Thanks for getting back to me. We have Control Point and Content Matrix running on a 3-server 2013 farm, are migrating to a 4-server MinRole topography 2016 farm, and I am wanting to make sure I don't muck anything up Metalogix-wise.
-Marc
Hi Eliza,
Thanks for getting back to me. We have Control Point and Content Matrix running on a 3-server 2013 farm, are migrating to a 4-server MinRole topography 2016 farm, and I am wanting to make sure I don't muck anything up Metalogix-wise.
-Marc